• Anglický jazyk

Time, cost and floor Area relationship

Autor: Muluken Tilahun

Time and cost are the two most important constraints among the four project constraints which are time,cost,quality and safety in project management. In this desertation I have addressed two of the above constraints and it is very interesting issues for... Viac o knihe

Na objednávku, dodanie 2-4 týždne

44.35 €

bežná cena: 50.40 €

O knihe

Time and cost are the two most important constraints among the four project constraints which are time,cost,quality and safety in project management. In this desertation I have addressed two of the above constraints and it is very interesting issues for project stakeholders in construction and other projects. This desertation has shown the relation ship between time and cost and a model is developed to predict construction time knowing project cost.Further more,this work has shown that there is a direct relationship between Construction cost and building total floor area and a model is develped to predict cost knowing the total floor area of the building from preliminary design. The desertaion can be used as asource document for further study.Similarly the desertation has reviewed different publications which are written in the area.

  • Vydavateľstvo: LAP LAMBERT Academic Publishing
  • Rok vydania: 2012
  • Formát: Paperback
  • Rozmer: 220 x 150 mm
  • Jazyk: Anglický jazyk
  • ISBN: 9783846598566

Generuje redakčný systém BUXUS CMS spoločnosti ui42.