• Anglický jazyk

Work Breakdown Structure

Autor: Lambert M. Surhone

High Quality Content by WIKIPEDIA articles! A work breakdown structure (WBS) in project management and systems engineering, is a tool used to define and group a project's discrete work elements (or tasks) in a way that helps organize and define the total... Viac o knihe

Na objednávku

132.91 €

bežná cena: 139.90 €

O knihe

High Quality Content by WIKIPEDIA articles! A work breakdown structure (WBS) in project management and systems engineering, is a tool used to define and group a project's discrete work elements (or tasks) in a way that helps organize and define the total work scope of the project. A work breakdown structure element may be a product, data, a service, or any combination. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control. Additionally the WBS is a dynamic tool and can be revised and updated as needed by the project manager.

  • Vydavateľstvo: OmniScriptum
  • Rok vydania: 2026
  • Formát: Paperback
  • Rozmer: 220 x 150 mm
  • Jazyk: Anglický jazyk
  • ISBN: 9786130321147

Generuje redakčný systém BUXUS CMS spoločnosti ui42.